Georgetown Metal Gates builds resident gates, telephone entry and walk gates for apartment managers and multifamily owners across Central Texas. Projects run from 1 keypad swap to 2 vehicle slide gates with a telephone entry and a resident walk gate.

Request a bid or a site walk

Gate Access for Occupied Rental Properties

We phase each stage around residents, so one vehicle lane stays open during the work. In 11 years and 1,412 projects, our crews have learned that a rental property cares most about uptime and about changing codes without a service call.

From the walk with your manager to the staff handover on the new system, our team handles every step of the access project. Serving Georgetown, Round Rock, Cedar Park, Leander and Pflugerville, we schedule loud work for the middle of the day and keep residents informed with a notice you can post.

Request a bid with your site map, lane count and unit count, and our estimator will walk the property and price the access system from what the walk shows.

What you can hold us to

The Shop Behind Every Gate

11 yearsDrawing, welding and hanging gates from our Georgetown shop
1,412Gates, fences, railings and entry systems completed
3-yearWorkmanship warranty covering welds, hinge alignment, sag and travel
45 milesFrom the San Gabriel River to Lake Travis and West Lake Hills

A Resident Entry Rebuild in Round Rock

Steel slide gate and access keypad at the drive into an apartment community.

Leopold, Old Settlers Park, Round Rock

Apartment and Multifamily Gate Access

Material
galvanized tube, powder coat, keypad and intercom
Size
2 vehicle slide gates, a telephone entry and a resident walk gate
Est. investment
$7,800 to $11,500
Est. duration
3 to 5 days

A garden apartment community manager with a broken resident entry gate that stood open most of the week, and a tenant list that changed every month.

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

Leopold manages a garden apartment community near Old Settlers Park in Round Rock, where the broken resident entry gate stood open most of the week and the tenant list changed every month. We installed separate entry and exit slide gates with safety sensors, a telephone entry that the office can update, and a walk gate kept apart from the vehicle lanes. The project took an estimated 3 to 5 days and sat in an estimated range of $7,800 to $11,500. One entry lane stayed open during each stage of the work, and the office now changes resident codes without a service call.

How Much Does Apartment Gate Access Cost in Georgetown?

A video intercom or telephone entry on one entry is typically estimated at $1,500 to $3,400 in Georgetown, and a vehicle slide gate is typically estimated at $1,500 to $5,000 per lane. Lane count, the entry system and any new power or data lines set your total. Most managers also ask about upkeep, and a preventive maintenance plan with 4 visits a year is typically estimated at $88 to $113 per gate each month.

Closed black dual-swing driveway gate with a keypad post between limestone pillars, a stucco home with a metal roof behind live oaks

Telephone entry or video intercom, one entry

Est. investment
$1,500 to $3,400
Est. duration
4 to 7 hours

Vehicle slide gate per lane

Est. investment
$1,500 to $5,000
Est. duration
2 to 3 days

Resident walk gate

Est. investment
$600 to $1,500
Est. duration
5 to 8 hours

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

ScopeEst. priceEst. time on site
Telephone entry or video intercom, one entryEst. $1,500 to $3,400Est. 4 to 7 hours
Vehicle slide gate per laneEst. $1,500 to $5,000Est. 2 to 3 days
Resident walk gateEst. $600 to $1,500Est. 5 to 8 hours

Use these community figures as estimates that can change by property. The written quote after the walk sets the final price and the schedule, and any power or data line is listed on its own line.

Telephone Entry, Keypad or Fob for Residents

A telephone entry suits a property with frequent visitors, a keypad suits a smaller one, and a fob or credential suits a property with high turnover. Most managers combine two parts of a keypad or intercom access package at a single entry, so residents use a fob and their guests use the directory. The real test is how your office updates it, because a system that needs a technician for each move-out soon gets ignored.

SystemBest forWhat to weigh
Telephone entry directoryVisitors, deliveries and larger communitiesNeeds a phone or cellular line, and a directory kept current
Keypad codesSmaller propertiesCodes spread, so plan to change them on a schedule
Fobs or credentialsHigher-turnover propertiesEach lost fob has to be cancelled by the office

Fire Department Access and Accessible Walk Gates

Plan fire access before you pick a gate, as Harriet's project did on a shared truck entrance on a fire lane where the gate needed the fire department's switch and sensor. In unincorporated Williamson County, the Fire Marshal's office takes a Gated Access Permit Application, and its checklist asks the plan to show how the gate is operated, naming a Knox Box as an example. Inside city limits, we ask that city's fire authority what it wants before we draw the plan.

The federal ADA Standards cover gates under section 404, Doors, Doorways, and Gates, and we review that section against your accessible route when a walk gate serves residents. An ornamental walk-through gate for residents should also stay separate from the vehicle lanes, so a person on foot never shares the path of a moving gate. Our automated track-guided slide gate runs on 24V DC continuous-duty operators sized to the leaf, and we fit the sensors that stop the gate when something is in the way, then test the reverse before handover.

Black horizontal-bar cantilever gate closed across a drive between cut limestone walls, an operator cabinet at the left and oak trees beyond

How We Phase Work Around Residents

We keep one lane running at all times, because a rental property cannot close its only entry. We build the new exit lane first while the old entry stays in service, the same order we used on Leopold's 2 vehicle slide gates, a telephone entry and a resident walk gate. Then we move traffic over, rebuild the entry, and test both lanes together. Your staff get a posted notice for each stage, and we keep loud work in the middle of the day.

The cutover is the step most projects get wrong. We load the resident list and test codes before the old system comes down, and the office practices adding and removing a resident while we are still on site.

Commercial Gate Jobs Behind Our Apartment Work

Harriet's 26 ft cantilever across a loading entrance near Old Settlers Park sat on a fire lane, so it needed the fire department's switch and sensor, and it passed the fire marshal's test. Winston off Brodie Lane in Sunset Valley runs six gates across one property, three of them had been stuck open for months, and every gate now closes with logs that show when it was last tested. Xavier's 200 ft perimeter run on Jones Road replaced a thin chain link line that was cut twice, which is the upgrade to look at when a property keeps losing its fence. Lucinda off Williams Drive had deliveries stopping at the gate, and the video intercom, keypad or phone entry with delivery codes that solved it works just as well for a leasing office. Kasper's 18 ft double leaf at Serenada Country Estates opens for emergency access, because a closed gate has to answer to more than the people who live behind it. Florence's 16 ft slide leaf on the Cypress Creek side fits a narrow side drive, and that layout often suits a rear lane at a garden community.

Black horizontal-bar sliding gate partly open on its track across a concrete drive beside a brick and stucco house, with a hill country tree line behind

What Every Apartment Access Project Includes

Safety
Monitored photo eyes plus edge sensors on every automatic gate, each one reverse-tested at handover, with a Knox key switch or Opticom receiver on gates across fire lanes, as the fire marshal requires.
Corrosion protection
G90 hot-dip galvanized tube on posts and hollow rails so rust cannot start from the inside, on posts set 24 to 36 inches deep in concrete, sized to the soil on the lot.
Finish and warranty
3-year workmanship warranty covering welds, hinge alignment, sag and travel, over a multi-stage wash, zinc-phosphate primer and electrostatic polyester powder coat, 3 to 5 mils thick.
Staff handover
Your office adds and removes a resident while we are on site.
Phasing
One vehicle lane open during each stage, with a notice to post.

Why Property Managers Call Us

Across 1,412 projects, we have found that managers remember the first week after cutover, so our 3-year workmanship warranty and an on-site staff handover cover it.

Apartment Access Service Areas Around Georgetown

We work on apartment and multifamily properties across a 45-mile radius, including Round Rock, Pflugerville and Cedar Park. Round Rock garden communities often have older swing gates ready for replacement, and Pflugerville properties more often add a second lane as they grow.

Black wrought iron fence and scrolled walk gate with a bolt latch in front of a brick and limestone bungalow, a pecan tree and a sidewalk

Related Commercial Gate Services

Managers planning access work often start with our commercial gates overview, add a gate service contract after handover, or compare it with gated community entries for HOA boards. Properties that need a harder perimeter can see security fencing, where anti-climb steel panels answer a yard with a thin chain link perimeter that was cut twice, and owners can also start from the Georgetown Metal Gates home page.

Apartment Gate Access Questions From Property Managers

How much does an apartment entry system cost?

Telephone entry or a video intercom on one entry is estimated at $1,500 to $3,400, and Leopold's full two-lane project sat in an estimated range of $7,800 to $11,500.

How long does an apartment gate project take?

Most two-lane projects need an estimated 3 to 5 days on site, spread across stages so a lane stays open, as Leopold's Round Rock project was.

Can the office change resident codes itself?

Yes, because we choose a system your staff can update, and they practice adding and removing a resident during handover.

Will residents lose access during the work?

No lane plan is final until your manager signs it, and we keep one vehicle lane open during each stage.

Do apartment gates need fire department access?

Plan on it, and we confirm what the fire authority for your address wants before the drawings are final.

Do you maintain the gate after installation?

Yes, through a service contract, and a plan is typically estimated at $88 to $113 per gate each month.

Should the walk gate be separate from the vehicle gate?

Yes, because a separate walk gate keeps people away from the moving gate and gives you a clearer accessible route.

Request Your Apartment Access Bid

Request a bid with your site map, lane count and unit count, and our estimator will walk your property in Georgetown, Round Rock, Cedar Park or Pflugerville.

Gates, Fences and Finishes

Start to finish

From Site Measure to the Final Safety Test

  1. Site measure

    We measure the opening, the grade and the swing or slide path before anything is drawn.

  2. Drawings and approval

    You approve a scaled drawing, the metal, the finish and the operator before steel is cut.

  3. Shop fabrication

    The gate is welded in our shop, then galvanized and powder coated before it leaves for your property.

  4. Install and safety test

    We set the posts, hang the gate, wire the operator and test every photo eye and safety edge with you.

Services

Other Bid Work Beside Apartment and Multifamily Gate Access

Request a bid

Ready to Talk About Apartment and Multifamily Gate Access?

Call us or send a site plan, photos or a gate count, and we will set a site walk and return a written bid.