Skip to content

Solar Gate Operators in Georgetown, TX

Georgetown Metal Gates is Central Texas's trusted expert in solar gate operators, specializing in panel and battery packages for swing and slide gates. We offer solar panel kits and 24V DC continuous-duty operators sized to the leaf.

Get a free gate estimate

Power a Gate Without Trenching to It

Our team provides panel mounting, battery wiring and sensor setup, delivering a gate that runs with no cord and no trench for homes and dependable access for both residential and commercial projects. On every solar gate operators job, workmanship is covered for 3 years across welds, hinge alignment, gate sag and gate travel, and 11 years in business with over 1,412 projects, a 4 ft walk gate to a 200 ft perimeter run, show how we build.

From sizing the battery bank to the last cloudy-week test, our team handles all of it. Serving Georgetown along with Cedar Park, Round Rock, Leander and Steiner Ranch, we power the gate at the end of a long drive without cutting your driveway.

Call us for a free estimate, and we will check your sun, count your daily cycles and send a written quote.

What you can hold us to

The Shop Behind Every Gate

11 yearsDrawing, welding and hanging gates from our Georgetown shop
1,412Gates, fences, railings and entry systems completed
3-yearWorkmanship warranty covering welds, hinge alignment, sag and travel
45 milesFrom the San Gabriel River to Lake Travis and West Lake Hills

A Solar Operator We Finished in Steiner Ranch

Closed black dual-swing driveway gate with a keypad post between limestone pillars, a stucco home with a metal roof behind live oaks

Delphine, near the Old Town Overlay, Georgetown

Automatic Driveway Gates

Material
galvanized steel, black powder coat
Size
14 ft double leaf
Est. investment
$4,600 to $6,400
Est. duration
2 to 3 days

A concrete driveway on soil that moved with the seasons, where the last gate post had leaned

Black dual-swing driveway gate with a solar panel on a post and an operator box, on a wet rural drive below a limestone outcrop and cedar trees

Nadine, Rocky Ridge, Steiner Ranch

Solar Gate Operators

Material
existing double swing gate, solar operator
Size
12 ft double leaf
Est. investment
$2,600 to $3,600
Est. duration
6 to 8 hours

A gate far from the house where trenching power would have meant cutting the driveway

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

Nadine in Steiner Ranch, in Rocky Ridge, had a gate far from the house where trenching would have cut the driveway. We fitted a solar panel with a dual-battery operator sized to the cycles per day on her 12 ft double leaf, an estimated $2,600 to $3,600 job that took an estimated 6 to 8 hours. There is no trench and no cord, and the gate still runs through cloudy weeks.

Delphine near the Old Town Overlay in Georgetown has a concrete drive on moving soil, where the last post leaned, so we set deeper post footings and ball-bearing hinges with battery backup on her 14 ft double leaf, an estimated $4,600 to $6,400 in an estimated 2 to 3 days.

Is Solar Right for Your Gate?

Solar works when the gate is far from power and the number of daily cycles is modest, which describes many drives around Leander, Volente and Lost Creek. A busy gate on a shaded drive may need the grid, and the table shows how we weigh it.

Your situationBest powerWhy
Gate far from the houseSolar with dual batteriesNo trench across the drive
Few cycles a day, open skySingle panelPanel keeps both batteries topped up
Heavy traffic or deep shadeGrid power or a bigger panelCycles can outrun the sun
Existing power at the postGrid operatorCheaper than a panel and batteries

Owners in Rollingwood and West Lake Hills with shaded oak lots usually learn this at the site visit, because a panel that sees four hours of sun cannot feed a busy gate.

Sun, Cycles and Safety Rules That Shape a Solar Install

Sizing starts with cycles per day, since each open and close draws the batteries down. A family gate cycles a few times a day, while a shared entry cycles far more, and that number sets the panel and the battery pair. Every solar operator still gets photo eyes, edge sensors and a reverse test, and most installations need at least two independent entrapment protection means in each direction plus at least two warning signs under DASMA's guidance. Texas 811 asks for notice before any post hole, and a solar gate saves the trench but not that call. Have your city confirm today's requirements before you commit to a build.

Black swing gate leaf with a newly mounted linear arm operator on a limestone pier, conduit running down the stone and a concrete pad

How We Install a Solar Operator

The install runs in this order:

  1. Survey: we log the sun on the post and count the cycles per day.
  2. Size: the panel, battery pair and operator are matched to the leaf.
  3. Mount: the panel faces south on the post, clear of shade.
  4. Wire: batteries, controller and sensor wiring go in a sealed box.
  5. Test: the gate cycles repeatedly while we trip each sensor in turn.

Out in Volente or Lost Creek, where the drive can run a long way, a missed survey is the usual reason a solar gate stalls in winter, so we never skip step one.

Solar Gate Operator Cost in Georgetown

A solar operator is priced like an operator retrofit, estimated at $1,800 to $3,800 for each system, and the leaf weight, the panel size and the sensor count move the price most.

Black wrought iron walk gate with spear tops set in a stucco wall with limestone caps, a flagstone path and live oak behind it

Single-leaf swing gate with operator

Est. investment
$2,500 to $5,000 for the full system
Est. duration
1 to 2 days

Galvanized steel, powder coat, one operator, photo eyes and keypad

Automated two-leaf swing entry

Est. investment
$4,000 to $8,000 for the full system
Est. duration
2 to 3 days

Two leaves, two operators, ball-bearing hinges, battery backup

Automated track-guided slide gate

Est. investment
$1,500 to $5,000 for the full system
Est. duration
2 to 3 days

Track set in concrete, chain or rack drive, edge sensors

Cantilever gate clearing a wide or sloped entry

Est. investment
$6,000 to $10,000 for the full system
Est. duration
2 to 4 days

Counterbalanced carriage, rack-and-pinion drive, no ground track

Ornamental walk-through gate

Est. investment
$600 to $1,500 for each gate installed
Est. duration
4 to 8 hours

Hand-built leaf, keyed or electric strike latch

Operator added to a gate you own

Est. investment
$1,800 to $3,800 for one operator system
Est. duration
4 to 8 hours

Motor, photo eyes and remotes added to a gate you already own

Keypad or intercom access package

Est. investment
$680 to $4,500 for each system
Est. duration
4 to 8 hours

Video intercom, keypad or phone entry, delivery codes

Welded ornamental fence

Est. investment
$50 to $85 a linear foot
Est. duration
2 to 4 days

Galvanized tube, powder coat, rackable panels

Hand-wrought forged iron fence

Est. investment
$85 to $130 a linear foot
Est. duration
3 to 6 days

Forged pickets and scrollwork, finish to the lot

Aluminum pool fence

Est. investment
$30 to $45 a linear foot
Est. duration
1 to 3 days

Self-closing, self-latching gate priced extra

Stair or balcony rail in iron

Est. investment
$65 to $135 a linear foot
Est. duration
5 to 10 hours

Field-measured, anchored to code height

Pivot entry door in iron or steel

Est. investment
$3,000 to $20,000 per door
Est. duration
1 to 2 days

Thermal break, glass, pivot hardware

Spiral staircase

Est. investment
$1,300 to $6,000 per staircase
Est. duration
1 to 14 days

Engineered, delivered and set with a hoist

Recurring gate service plan

Est. investment
$88 to $113 a gate each month
Est. duration
1 to 3 hours

Inspection, lubrication, sensor and limit checks

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

ScopeEst. priceEst. time on site
Operator added to a gate you ownEst. $1,800 to $3,800 for one operator systemEst. 4 to 8 hours
Recurring gate service planEst. $88 to $113 a gate each monthEst. 1 to 3 hours per visit

Solar gate operators pricing is estimated for the Georgetown area and subject to change. The site visit comes first; the written quote after it sets the final price and the install schedule, and leaf weight, panel size and sensor count decide the figures.

What Every Solar Install Includes

Steel Tubing Gauge & Wall Thickness
posts of 11-gauge to 3/16-inch, rails of 14-gauge and pickets of 16-gauge on everything we fabricate
Protective Coating & Finishing Process
Multi-stage wash, zinc-phosphate primer and electrostatic polyester powder coat, 3 to 5 mils thick
Corrosion Protection (Hot-Dip Galvanizing vs Pre-Galvanized)
G90 hot-dip galvanized tube on posts and hollow rails so rust cannot start from the inside
Post Footing Depth & Concrete Anchor Specifications
Posts set 24 to 36 inches deep in concrete, sized to the soil on the lot
Picket Spacing & Child/Pet Safety Gap
3.5 to 3.875 inches clear between pickets
Gate Hinge Heavy-Duty Load Rating & Bearings
Ball-bearing barrel hinges sized to the leaf weight
Automatic Gate Operator Drive & Motor Type
24V DC continuous-duty operators sized to the leaf
Entrapment Protection: Photo Eyes & Edge Sensors
Monitored photo eyes plus edge sensors on every automatic gate, tested against our entrapment checklist before we leave
Municipal Emergency Access Compliance
Knox key switch or Opticom receiver on gates across fire lanes, as the fire marshal requires
Slope Racking vs Stepping Capability
Rackable panels follow a slope; steps are used where the grade is too steep to rack
Picket Finial & Security Top Style
Spear, triad, flare, fleur-de-lis or flat-top finials, chosen per lot and per city rule
Bottom Ground Clearance
2 to 3 inches of clearance above lawn grade, less over paved drives
Smart Access Control & Intercom System
Video intercom, keypad or phone entry with delivery codes
Gate Fall Protection & Mechanical Travel Stops
Gate catchers and positive travel stops on every swing and slide leaf
Solar Power & Battery Backup Readiness
Solar panel with dual-battery backup where trenching power is not practical

Solar Gate Materials and Related Pages

A solar panel is one way to power an operator, so gate operator installation covers the motor side, and gate access control adds the keypad or intercom. If the gate itself is the problem, our automatic driveway gates page covers a full new system, and steel gate installation covers the leaf.

Why Choose Our Crew for Solar Gate

After 11 years and 1,412 projects across a 45-mile radius, we have seen solar gates fail from an undersized panel far more often than from a bad motor. We count cycles first, and the work then carries 3 years of workmanship warranty covering welds, hinge alignment, sag and travel.

Black horizontal-bar cantilever gate closed across a drive between cut limestone walls, an operator cabinet at the left and oak trees beyond

Solar Gate Service Areas

We install across a 45-mile radius of the Georgetown shop, including Steiner Ranch, Cedar Park, Round Rock and Leander. Towns beyond these are covered on the service area page.

Questions About Solar Gate Operators

How much does a solar gate operator cost in Georgetown?

It is priced like an operator retrofit, estimated at $1,800 to $3,800 for each system, and your written quote fixes the final price.

How long does the install take?

Most installs take an estimated 4 to 8 hours , and Nadine's Steiner Ranch gate took an estimated 6 to 8 hours.

Will it work in cloudy weeks?

Yes, a dual-battery operator sized to the cycles per day kept Nadine's gate running through cloudy weeks.

Can I add solar to my existing operator?

Often yes, if it is a 24V DC unit, and across our 45-mile radius from Georgetown to Lost Creek we check that at the site visit.

Will the gate still open if the batteries run low?

Yes, every operator has a manual release, and in Rollingwood or Sunset Valley we size the pair so low batteries are rare.

Do I need a permit?

We confirm at your address whether a Georgetown or Cedar Park fence rule reaches the gate.

Request Your Solar Gate Estimate

Call us for a free estimate on your Georgetown gate, and we will check your sun, test the swing and send a written quote. The 1,412 projects we finished in 11 years include solar operator calls like yours.

Gates, Fences and Finishes

Start to finish

From Site Measure to the Final Safety Test

  1. Site measure

    We measure the opening, the grade and the swing or slide path before anything is drawn.

  2. Drawings and approval

    You approve a scaled drawing, the metal, the finish and the operator before steel is cut.

  3. Shop fabrication

    The gate is welded in our shop, then galvanized and powder coated before it leaves for your property.

  4. Install and safety test

    We set the posts, hang the gate, wire the operator and test every photo eye and safety edge with you.

Free estimate

Ready to Talk About Solar Gate Operators?

Call us or send the form, and we will book a site measure and a written estimate.

Call (512) 316-0849

Calls only, we do not receive text messages.

Call (512) 316-0849